Loopierr
@Loopierr
We're all gonna make it bros 🤝 @elevateT1 https://gmgn.ai/r/Loopierr
The GMGN $500K Christmas Challenge 🎄🎅 I've decided to run a challenge for myself to make $500k in 50 days. On christmas, whatever I make i'll be dropping % of profits to my ACTIVE GMGN referrals here: gmgn.ai/r/Loopierr The plan is to trade on every single chain: BASE,…
Day 9-10/50 of $500K Christmas Challenge 🎄🎅 -$12,400 or -87 SOL +$15,000 EVM Total: $85,600 *Sorry been inactive this weekend. I will be back better tomorrow for a fresh week. We got a lot of grinding to do as we're behind quota. I still feel optimistic just did some self…
no stream, need to give updates and i’m slacking bc touching grass and inhaling alcohol. look away, enjoy yourself with friends n family. life is short, none of this shit actually matters. be happy. i’ll be back with you all tomorrow.
中国最大的冲饮公司(九阳豆浆)于11月11日推出哈基米系列的豆浆饮品。 基于哈基米IP在中国的庞大流量,上线仅一天全平台销量已经突破25万单(截止发推拼多多18万单,淘宝2万单,抖音商城4万单,其他平台未统计)。 火爆程度使得今日其背后公司九阳股份股票大涨2.24%,目前公司市值76.68亿。…
Day 8/50 of $500K Christmas Challenge 🎄🎅 Got cooked, morale is low. We try again tomorrow. -$11,000 or so realized. Total: $83,000
Day 7/50 of $500K Christmas Challenge 🎄🎅 $1.32K or 8.3 SOL $1.85K or 1.2 BNB Total: $94.52K
My fav movie as a kid was a movie called Looper and for some reason I love the meaning and word 'croupier' (google it, if you don't know meaning) merge those two together, add an r, and you got loopierr!
Day 6/50 of $500K Christmas Challenge 🎄🎅 $8,440 or 49.68 SOL -8,300 or -8.2 BNB Total: $91.35K
Day 5/50 of $500K Christmas Challenge 🎄🎅 $24,100 or 148 SOL $31,570 EVM Total: $91.25K gmgn.ai/r/Loopierr
Day 5/50 of $500K Christmas Challenge 🎄🎅 $24,100 or 148 SOL $31,570 EVM Total: $91.25K gmgn.ai/r/Loopierr
Day 4/50 $500K Christmas Challenge 🎄🎄🎅 $2.58K or 16.4 SOL Total: $35.58K
United States 趨勢
- 1. Clay Higgins 28.6K posts
- 2. Grisham 5,098 posts
- 3. Scotland 100K posts
- 4. Peggy 8,371 posts
- 5. Dominguez 3,321 posts
- 6. Switch 2 27.4K posts
- 7. Saudi 275K posts
- 8. Bellinger 2,977 posts
- 9. Cashman 1,423 posts
- 10. Nicki 142K posts
- 11. Dearborn 72.5K posts
- 12. Mary Bruce 8,170 posts
- 13. Khashoggi 65.1K posts
- 14. #LightningStrikes N/A
- 15. Gemini 3 56.4K posts
- 16. Jeffrey Epstein 353K posts
- 17. #UNBarbie 18.6K posts
- 18. Kyle Teel N/A
- 19. Hakeem Jeffries 71.4K posts
- 20. The House 584K posts
Something went wrong.
Something went wrong.