Source_options's profile picture. Full-time options trader
Daily plans • Live Alerts • Real Education
SPX • Tech • Price Action
Real trades. Real results. No BS.

Source Options Trader

@Source_options

Full-time options trader Daily plans • Live Alerts • Real Education SPX • Tech • Price Action Real trades. Real results. No BS.

Fijado

Welcome to Source Options Trader 👋 I’m a full-time options trader. I focus on SPX, tech, and high-volume names only. Inside the private Discord, members get: • Daily trading plans before the bell • Real-time alerts with entries & exits • Price action + 3 EMA strategy •…


If your strategy only survives when the market is green… you don’t have a strategy, you have a prayer. Real traders adapt. Real strategies work in any direction. Up, down, chop, discipline wins where luck dies. Hard facts. Not everyone can handle them. Source


4.8-star reviews ⭐️⭐️⭐️⭐️⭐️ Grateful beyond words. Seeing reviews like these reminds me exactly why I do this every single day. This community is built on trust, discipline, and growth, and I’m truly honored that so many of you took the time to share your experience. Your…

Source_options's tweet image. 4.8-star reviews ⭐️⭐️⭐️⭐️⭐️

Grateful beyond words.
Seeing reviews like these reminds me exactly why I do this every single day.

This community is built on trust, discipline, and growth, and I’m truly honored that so many of you took the time to share your experience.
Your…

You don’t need 20 tickers or 30 plays a day to grow an account. One high-quality setup with proper sizing can change your week. Slow, controlled growth always outperforms emotional gambling.


$SPY 660C | $82 → $255 / 210% 🔥 This trade is a perfect example of how the simple, repeatable Source strategy does the job every single time, no guessing, no overthinking, just levels + structure. 🟩 The Setup My entire plan was built around one thing: **The trendline +…

Source_options's tweet image. $SPY 660C | $82 → $255 / 210% 🔥

This trade is a perfect example of how the simple, repeatable Source strategy does the job every single time, no guessing, no overthinking, just levels + structure.

🟩 The Setup  
My entire plan was built around one thing:  
**The trendline +…
Source_options's tweet image. $SPY 660C | $82 → $255 / 210% 🔥

This trade is a perfect example of how the simple, repeatable Source strategy does the job every single time, no guessing, no overthinking, just levels + structure.

🟩 The Setup  
My entire plan was built around one thing:  
**The trendline +…

$UNH Two Clean Wins off the Trendline Breakout Beautiful structure on $UNH yesterday, and both calls paid exactly as planned. 🟩 The Setup Price had been respecting a downward trendline. After multiple touches, we waited for a clean break. Once $UNH broke above the…

Source_options's tweet image. $UNH Two Clean Wins off the Trendline Breakout

Beautiful structure on $UNH yesterday, and both calls paid exactly as planned.

🟩 The Setup  
Price had been respecting a downward trendline. After multiple touches, we waited for a clean break.  
Once $UNH broke above the…

Weekly Recap from Source ✅ Total trades: 54 Winners: 36 Losers: 18 (mostly low-size Lotto trades) Top 10 Trades by % Profit: 1️⃣ $SPX 6660C → 370% 🚀🔥 2️⃣ $DELL 120C → 258% 🚀 3️⃣ $SPY 666C → 240% ⚡🔥 4️⃣ $SPY 660C → 210% ⚡ 5️⃣ $APP 500P → 150% 🔥 6️⃣ $GS 830C →…

Source_options's tweet image. Weekly Recap from Source ✅

Total trades: 54
Winners: 36
Losers: 18 (mostly low-size Lotto trades)

Top 10 Trades by % Profit:
1️⃣ $SPX 6660C → 370% 🚀🔥  
2️⃣ $DELL 120C → 258% 🚀  
3️⃣ $SPY 666C → 240% ⚡🔥  
4️⃣ $SPY 660C → 210% ⚡  
5️⃣ $APP 500P → 150% 🔥  
6️⃣ $GS 830C →…

Source Daily Recap 🔥 Today was full of clean execution and some massive wins: Top trades: 🟩 $DELL 120C $60 → $215 (+258%) 🟩 $SPY 660C $82 → $255 (+210%) 🟩 $APP 500P $340 → $850 (+150%) 🟩 $UNH 315C $140 → $325 (+132%) 🟩 $SPX 6630C $10.15 → $18.20 (+80%) 🟩…

Source_options's tweet image. Source Daily Recap 🔥

Today was full of clean execution and some massive wins:

Top trades:  
🟩 $DELL 120C $60 → $215 (+258%)  
🟩 $SPY 660C $82 → $255 (+210%)  
🟩 $APP 500P $340 → $850 (+150%)  
🟩 $UNH 315C $140 → $325 (+132%)  
🟩 $SPX 6630C $10.15 → $18.20 (+80%)  
🟩…
Source_options's tweet image. Source Daily Recap 🔥

Today was full of clean execution and some massive wins:

Top trades:  
🟩 $DELL 120C $60 → $215 (+258%)  
🟩 $SPY 660C $82 → $255 (+210%)  
🟩 $APP 500P $340 → $850 (+150%)  
🟩 $UNH 315C $140 → $325 (+132%)  
🟩 $SPX 6630C $10.15 → $18.20 (+80%)  
🟩…
Source_options's tweet image. Source Daily Recap 🔥

Today was full of clean execution and some massive wins:

Top trades:  
🟩 $DELL 120C $60 → $215 (+258%)  
🟩 $SPY 660C $82 → $255 (+210%)  
🟩 $APP 500P $340 → $850 (+150%)  
🟩 $UNH 315C $140 → $325 (+132%)  
🟩 $SPX 6630C $10.15 → $18.20 (+80%)  
🟩…
Source_options's tweet image. Source Daily Recap 🔥

Today was full of clean execution and some massive wins:

Top trades:  
🟩 $DELL 120C $60 → $215 (+258%)  
🟩 $SPY 660C $82 → $255 (+210%)  
🟩 $APP 500P $340 → $850 (+150%)  
🟩 $UNH 315C $140 → $325 (+132%)  
🟩 $SPX 6630C $10.15 → $18.20 (+80%)  
🟩…

The setups we shared hit their marks today $SPX 6630C $10.15 → $18.20 (+80%) $SPY 660C $82 → $255 (+210%) Alerts were sent live on Discord, members followed in real-time and captured these massive wins. Check the screenshots for proof of the alerts and execution.…

Source_options's tweet image. The setups we shared hit their marks today   

$SPX 6630C $10.15 → $18.20 (+80%)  
$SPY 660C $82 → $255 (+210%)  

Alerts were sent live on Discord, members followed in real-time and captured these massive wins.  

Check the screenshots for proof of the alerts and execution.…
Source_options's tweet image. The setups we shared hit their marks today   

$SPX 6630C $10.15 → $18.20 (+80%)  
$SPY 660C $82 → $255 (+210%)  

Alerts were sent live on Discord, members followed in real-time and captured these massive wins.  

Check the screenshots for proof of the alerts and execution.…

What if I told you that I turned $1K into $4K in MINUTES trading SPX options? The exact strategy? It's yours FREE. Comment "GUIDE" below and I'll DM you our battle-tested options trading playbook. No BS, just gains. Who's in? 📈

Source_options's tweet image. What if I told you that I turned $1K into $4K in MINUTES trading SPX options? The exact strategy? 
It's yours FREE.

Comment "GUIDE" below and I'll DM you our battle-tested options trading playbook. 

No BS, just gains. Who's in? 📈

Still trading solo and missing out on the market's best setups every day? The Source team locks in big wins **within the first hour of trading** precision, timing, and clean execution. **All of our targets were hit today.** Want to see it in action for yourself? Check the…

Options Trading LOTTO Friday Plan – 11/21 $SPY 650P → Below 655 / Target 645 $IONQ 39P → Below 40 / Target 37 $MU 195P → Below 200 / Target 192 $APP 500P → Below 540 / Target 490 ❤️ Hit the like if you want more daily trade plans. Turn on notifications so you never miss…



$APP 500P $340 to $850 / 150% 😎

Source_options's tweet image. $APP 500P $340 to $850 / 150% 😎

Options Trading LOTTO Friday Plan – 11/21 $SPY 650P → Below 655 / Target 645 $IONQ 39P → Below 40 / Target 37 $MU 195P → Below 200 / Target 192 $APP 500P → Below 540 / Target 490 ❤️ Hit the like if you want more daily trade plans. Turn on notifications so you never miss…



A great start to the day with some clean wins ✅ $UNH 315C $121 → $215 (+77%) $SPY 660C $99 → $150 (+50%) $UNH 315C $140 → $325 (+132%) $APP 500P $340 → $720 (+111%) Clean setups, perfect execution. Trade the levels, not emotions. – Source

Options Trading LOTTO Friday Plan – 11/21 $SPY 650P → Below 655 / Target 645 $IONQ 39P → Below 40 / Target 37 $MU 195P → Below 200 / Target 192 $APP 500P → Below 540 / Target 490 ❤️ Hit the like if you want more daily trade plans. Turn on notifications so you never miss…



Good morning, traders. The market is loaded with fire setups this morning the kind that pay fast and pay big. Are you ready to make some noise today? A few of the clean setups on my radar: $SPY – $APP – $TSLA – $META Let’s execute with confidence. – Source 🔥


Options Trading LOTTO Friday Plan – 11/21 $SPY 650P → Below 655 / Target 645 $IONQ 39P → Below 40 / Target 37 $MU 195P → Below 200 / Target 192 $APP 500P → Below 540 / Target 490 ❤️ Hit the like if you want more daily trade plans. Turn on notifications so you never miss…


Source Daily Recap ✅ Today was a mixed day, but some **monster trades** came through: Top trades: • $TSLA 430C $177 → $390 (+120%) • $GS 830C $310 → $775 (+150%) • $AVGO 377.5C $205 → $410 (+100%) • $BA 180P $105 → $220 (+110%) • $QQQ 600C $100 → $150…


$SPX dropping 100 points has become a habit. We’re targeting 6655 again, and then it’ll start chopping into the close. $TSLA we locked in amazing, solid gains today with the Discord members. My targets were already set at 420 and 426, and we sold our position right there. It’s…


$TSLA ✅ Following the plan and hitting targets, we locked in **+120%** gains in the first half hour with Discord members. All alerts were shared **live on X and inside Discord** hope everyone was able to capture some profits today. Trade the levels, stay disciplined, and…

Source_options's tweet image. $TSLA ✅

Following the plan and hitting targets, we locked in **+120%** gains in the first half hour with Discord members.  

All alerts were shared **live on X and inside Discord** hope everyone was able to capture some profits today.  

Trade the levels, stay disciplined, and…
Source_options's tweet image. $TSLA ✅

Following the plan and hitting targets, we locked in **+120%** gains in the first half hour with Discord members.  

All alerts were shared **live on X and inside Discord** hope everyone was able to capture some profits today.  

Trade the levels, stay disciplined, and…

Options Trading Plan – 11/20 $SPY 673C → Above 670 / Target 676 $AMZN 230C → Above 225 / Target 234 $TSLA 425C → Above 412 / Target 430 $META 615C → Above 600 / Target 618 Hit ❤️ If you want more daily trade plans? Turn on notifications so you never miss the next one.



Alerts – All runners sold here $TSLA 430C @ 3.90 (120%)

Alerts – All out leave runners $TSLA 430C @ 3.60 (103%)



Alerts – All out leave runners $TSLA 430C @ 3.60 (103%)

Alerts – Sold more $TSLA 430C @ 3.20 (80%)



Loading...

Something went wrong.


Something went wrong.