WarriorTimTim's profile picture.

TimTim

@WarriorTimTim

PSN because i'm a Laughing Joking Numbnuts

Follow @videogamedeals & Repost for a Chance to Win 1 of 10 Codes For Angry Video Game Nerd 8-bit (PSN/eShop) Provided by @Retroware. Ends Monday at 9PM ET. ow.ly/7WnS50Xfjjw Reply With PSN or eShop to Pick Platform of Choice.



Platinum No. 44 - Quake Many Saves Were Made. Thank you for another tour across the dark dimensions. Can't wait to see what @NightdiveStudio has planned next. #PS5Share #PS5 #Quake

WarriorTimTim's tweet image. Platinum No. 44 - Quake

Many Saves Were Made.

Thank you for another tour across the dark dimensions. Can't wait to see what @NightdiveStudio has planned next. #PS5Share #PS5 #Quake

TimTim reposted

Gears was a thinly veiled metaphor for Bush's war for oil. If the Coalition had a brain they'd get back to doing that shiz. THAT'S RIGHT I SAID IT.

It's not even gears of war anymore they took "of war" out its just gears now 😭😭😭



Platinum Trophy No. #30 Defense Grid 2 I had a lot of fun with this one, until I realized I was doing everything wrong for the platinum trophy. Read a guide for this one. Struck that itch of Tower Defense I've been craving since High School. @PlayStation @DefenseGrid #PS4

WarriorTimTim's tweet image. Platinum Trophy No. #30 Defense Grid 2

I had a lot of fun with this one, until I realized I was doing everything wrong for the platinum trophy. Read a guide for this one. Struck that itch of Tower Defense I've been craving since High School.  @PlayStation @DefenseGrid #PS4

TimTim reposted

TimTim reposted

The Legend of Zelda: Tears of the Kingdom Switch OLED is confirmed! Releases on April 28th!

NinWire's tweet image. The Legend of Zelda: Tears of the Kingdom Switch OLED is confirmed! Releases on April 28th!

TimTim reposted

Don't like this tweet But do RT I want maximum views but 0 likes


TimTim reposted

I never ask for anything. But I'm asking anyone that is willing to subscribe to my podcast "Kliq This". My son passed away 6 weeks ago and he wanted to 100k subscribers so he could get a plaque from YouTube. I wa nt to put it next to his urn. Thank you


Platinum Trophy No. 29 Travis Strikes Again: No More Heroes Complete Edition #PS4 #PS5 #PS4share #PlayStationTrophy

WarriorTimTim's tweet image. Platinum Trophy No. 29
Travis Strikes Again: No More Heroes Complete Edition #PS4 #PS5 #PS4share #PlayStationTrophy

The Messenger I am The Messenger (Platinum No. 28) Obtain all other trophies #PS4share #PS4 #PS5

WarriorTimTim's tweet image. The Messenger
I am The Messenger (Platinum No. 28) Obtain all other trophies #PS4share #PS4 #PS5
WarriorTimTim's tweet image. The Messenger
I am The Messenger (Platinum No. 28) Obtain all other trophies #PS4share #PS4 #PS5

TimTim reposted

For those that couldn't grab a copy from the @MondoNews Flat File sale today, I still have Alien APs (and others) still available in my shop! johnny-dombrowski.myshopify.com


TimTim reposted

You cannot pet the dog in Elden Ring


TimTim reposted

TimTim reposted

My little game for SEGA Genesis/Mega Drive is 60% off on Steam right now. ROM file included if you'd prefer to play on emulators/Everdrive. RT's appreciated ♥️ #sega #megadrive #gamedev #SteamAutumnSale #RETROGAMING


Legendary Edition: Mass Effect 3 N7 Elite (Platinum) ME3: Acquire all trophies #PS4share #PS4 #PS5

WarriorTimTim's tweet image. Legendary Edition: Mass Effect 3
N7 Elite (Platinum)
ME3: Acquire all trophies #PS4share #PS4 #PS5

Legendary Edition: Mass Effect 2 N7 Elite (Platinum) ME2: Acquire all trophies #PS4share #PS4 #PS5

WarriorTimTim's tweet image. Legendary Edition: Mass Effect 2
N7 Elite (Platinum)
ME2: Acquire all trophies #PS4share #PS4 #PS5

Legendary Edition: Mass Effect N7 Elite (Platinum) ME1: Acquire all trophies #PS4share #PS4 #PS5 #bioware

WarriorTimTim's tweet image. Legendary Edition: Mass Effect
N7 Elite (Platinum)
ME1: Acquire all trophies #PS4share #PS4 #PS5 #bioware

Loading...

Something went wrong.


Something went wrong.