sglight's profile picture. Freelance Lighting Design / Lighting Technician

SG Lighting/Tech

@sglight

Freelance Lighting Design / Lighting Technician

Down in Fort Worth for USITT. Hope to run into some old familiar faces!


SG Lighting/Tech reposted

Seconded. RT @AnonymousLD: I find the term "techie" annoying refuse to use it. Does anyone else agree?


SG Lighting/Tech reposted

A wired ETC remote! I miss those so much! MT @seandaniels:I find other people's tech very soothing. No idea why. tinyurl.com/8432p7r


Oh. Right. Working on the Regional Premier of Jane Eyre at the Legacy Theatre. No biggie.


Down in Atlanta. Working. That is all.


Updates! Get your updates, here! wp.me/p1sTIK-23


Headed down to Atlanta to work with The Legacy Theatre on their holiday show. I dread 10 hour drives...


On the plus side, running a show you designed makes it easier to redesign cues in the middle of the opening night perf. #2amlx


I absolutely LOVE ETC's online tutorials for the ION. I basically went from 0 knowledge to building a show w/ effects in a week.


Feast fit for a king. Or at least a guy who's worked hard all day. #itswhatsfordinner

sglight's tweet image. Feast fit for a king. Or at least a guy who's worked hard all day. #itswhatsfordinner

So far, I've pretty much fallen in love with the #ion console. We'll see if that changes once I start programming. #techweek #freelance #ld


SG Lighting/Tech reposted

Off-topic quote of the day: "I am healthier than whole but not as much as skim: I am the 2%."


Draft, draft, draft, draft, draft, draft, draft. #Vectorworks #lightplot


SG Lighting/Tech reposted

I would wager that many "freelancers" would take the minor cut to the take-home to not worry about dealing with the 1099 tax issue. #2amt


SG Lighting/Tech reposted

(Redone for clarity) #theatreBS: When the same theatres that tout that they use AEA actors fight tooth & nail to keep crew from being IATSE.


SG Lighting/Tech reposted

#theatreBS Some of the same theatres that tout that they use AEA actors will fight tooth & nail to keep crew from being IATSE.


STAGES ST. LOUIS Electrics Dept is looking for an electrician for 3 wks. Dates are Aug 22 thru Sept 9. DM if interested. Please RT.


When trying to control dimmers, make sure the DMX splitter is powered on before you go crazy. #loadin #2amlx


Loading...

Something went wrong.


Something went wrong.