#ovm_featured_projects نتائج البحث
{Update} Completion of Post-tensioned concrete slabs works for the first Two Towers of Alamein Towers “Package 1” Project in New Alamein city in Egypt, Execution of OVM Certified Applicator in Egypt: SteelTec Co. #OVM_Featured_Projects
{Update} Completion of pretressed concrete slabs of project: "Al-Masah Hotel" in New Alamein city In Egypt. OVM is proud of applying its Post-tensioning system in construction of Towers: (3), (4), (5), & (6). #OVM_Featured_Projects
{Update} Completion of Post tensioned concrete slabs works of “Katara Towers” Project in Doha city, Qatar. Execution of OVM Agent in Qatar: MACE-Qatar, which has implemented around 70% of PT works in the project using OVM Post-Tensioning System. #OVM_Featured_Projects
{Photos} of “Al-Khatatba” Bridge, Project that was completed in 2018 with contribution of OVM Agent in Egypt: BETA Company. #OVM_Featured_Projects
{Photos} from the construction of Project: Al-Bidda Roundabout Bridge (RA/222), which was completed last year (2018), with the contribution of OVM Agent in Kuwait, Canar Co. which completed all Post-Tensioning works. #OVM_Featured_Projects
OVM Is proud for its contribution in the accomplishment of project “Extension of Southern Expressway” this year in Srilanka, OVM has supplied Post-Tensioning system, Bearings, Expansion Joints, & Equipment. #OVM_Featured_Projects
{Photos} of “Dekhila Bridge” in Alexandria state in Egypt, Bridge which connects Dekhila Seaport with Coastal Road was completed in 2018 with participation of OVM Agent completing Post-Tensioning works: BETA Company. #OVM_Featured_Projects
{Photos} during the Post-tensioning works for concrete slabs of “Mall of Oman” Project in Sultanate of Oman, which was accomplished last month using OVM Post-tensioning system. #OVM_Featured_Projects
{Update} Completion of Post-tensioning works for “Hair Ghanimiya Interchange” Project in Riyadh city in Saudi Arabia, Project which consist of Two bridges constructed using PT Box Girder Sections. -Execution of PT: Kabbani Post Tensioning (KPT-OVM). #OVM_Featured_Projects
{Update} Completion of Post-tensioning works for (C3) & (C4) Towers of Alamein Towers {LD01} Project, in New Alamein city in Egypt. Execution of PT Works through OVM Certified Applicator in Egypt: Orascom-CPD. #OVM #Post_Tensioning #OVM_Featured_Projects
{Update} Early this month, Opening of “Wuijagang” Suspension Bridge over Yangtze River in “Hubei” Province in China. With significant role, OVM has supplied Main Cables of the suspension bridge, Anchoring System, Cables Cranes, and related services. #OVM #OVM_Featured_Projects
{Photos} Orouba Bridge, which was opened to traffic last month in Cairo city in Egypt, was completely constructed using OVM Prestressing System. #OVM #Prestressing #OVM_Featured_Projects
{Photos} Supply and Installation of OVM Expansion Joints at “Al-Jahra Road” Project in Kuwait. #OVM #AL_JAHRA_ROAD #OVM_FEATURED_PROJECTS #KUWAIT #EXPANSION_JOINTS
{Photo} of “Rod El-Farag” Cable Stayed Bridge which was completely constructed Mid-Year, the bridge which has made major improvements in the traffic movement in Cairo city in Egypt was constructed using OVM Stay Cable System. #OVM #OVM_Featured_Projects #OVM_Stay_Cable_System
{Photos} Supply and Installation of OVM Expansion Joints at “Al-Jahra Road” Project in Kuwait. #OVM #AL_JAHRA_ROAD #OVM_FEATURED_PROJECTS #KUWAIT #EXPANSION_JOINTS
{Update} Early this month, Opening of “Wuijagang” Suspension Bridge over Yangtze River in “Hubei” Province in China. With significant role, OVM has supplied Main Cables of the suspension bridge, Anchoring System, Cables Cranes, and related services. #OVM #OVM_Featured_Projects
{Photos} Orouba Bridge, which was opened to traffic last month in Cairo city in Egypt, was completely constructed using OVM Prestressing System. #OVM #Prestressing #OVM_Featured_Projects
{Update} Completion of Post-tensioning works for (C3) & (C4) Towers of Alamein Towers {LD01} Project, in New Alamein city in Egypt. Execution of PT Works through OVM Certified Applicator in Egypt: Orascom-CPD. #OVM #Post_Tensioning #OVM_Featured_Projects
{Update} Completion of Post-tensioned concrete slabs works for the first Two Towers of Alamein Towers “Package 1” Project in New Alamein city in Egypt, Execution of OVM Certified Applicator in Egypt: SteelTec Co. #OVM_Featured_Projects
{Update} Completion of Post tensioned concrete slabs works of “Katara Towers” Project in Doha city, Qatar. Execution of OVM Agent in Qatar: MACE-Qatar, which has implemented around 70% of PT works in the project using OVM Post-Tensioning System. #OVM_Featured_Projects
{Update} Completion of Post-tensioning works for “Hair Ghanimiya Interchange” Project in Riyadh city in Saudi Arabia, Project which consist of Two bridges constructed using PT Box Girder Sections. -Execution of PT: Kabbani Post Tensioning (KPT-OVM). #OVM_Featured_Projects
{Photos} during the Post-tensioning works for concrete slabs of “Mall of Oman” Project in Sultanate of Oman, which was accomplished last month using OVM Post-tensioning system. #OVM_Featured_Projects
{Update} Completion of Post-tensioning works for concrete slabs in “Mall of Oman” Project using OVM Post-Tensioning system. Mall after opening will be considered the biggest mall in Sultanate of Oman. #OVM_Featured_Projects
{Photo} of “Rod El-Farag” Cable Stayed Bridge which was completely constructed Mid-Year, the bridge which has made major improvements in the traffic movement in Cairo city in Egypt was constructed using OVM Stay Cable System. #OVM #OVM_Featured_Projects #OVM_Stay_Cable_System
{Photos} of “Dekhila Bridge” in Alexandria state in Egypt, Bridge which connects Dekhila Seaport with Coastal Road was completed in 2018 with participation of OVM Agent completing Post-Tensioning works: BETA Company. #OVM_Featured_Projects
{Update} Completion of pretressed concrete slabs of project: "Al-Masah Hotel" in New Alamein city In Egypt. OVM is proud of applying its Post-tensioning system in construction of Towers: (3), (4), (5), & (6). #OVM_Featured_Projects
OVM Is proud for its contribution in the accomplishment of project “Extension of Southern Expressway” this year in Srilanka, OVM has supplied Post-Tensioning system, Bearings, Expansion Joints, & Equipment. #OVM_Featured_Projects
{Photos} of “Al-Khatatba” Bridge, Project that was completed in 2018 with contribution of OVM Agent in Egypt: BETA Company. #OVM_Featured_Projects
{Photos} of “Al-Fangary Bridge", Project that was completed in 2017 with contribution of OVM Agent in Egypt: BETA Company. BETA has accomplished Post-Tensioning works using OVM Post-Tensioning System. #OVM_Featured_Projects
{Photos} from the construction of Project: Al-Bidda Roundabout Bridge (RA/222), which was completed last year (2018), with the contribution of OVM Agent in Kuwait, Canar Co. which completed all Post-Tensioning works. #OVM_Featured_Projects
Photos from the opening of Stayed Cable Bridge “Rod El-Farag” in Cairo, Egypt, Bridge was constructed with Length (540 m.) & Width (67 m.), was constructed with (160) Stay Cables using OVM Stay Cable System. #OVM #Stay_Cable_Bridges #OVM_Featured_Projects
New Breaking Record of an accomplished OVM Project: "Rod El-Farag" Cable-stayed Bridge in Cairo, Egypt. Bridge was constructed with (160) Cables using OVM Stay Cable System. #OVM_Featured_Projects
{Photos} of “Al-Khatatba” Bridge, Project that was completed in 2018 with contribution of OVM Agent in Egypt: BETA Company. #OVM_Featured_Projects
{Update} Completion of Post-tensioned concrete slabs works for the first Two Towers of Alamein Towers “Package 1” Project in New Alamein city in Egypt, Execution of OVM Certified Applicator in Egypt: SteelTec Co. #OVM_Featured_Projects
{Update} Completion of pretressed concrete slabs of project: "Al-Masah Hotel" in New Alamein city In Egypt. OVM is proud of applying its Post-tensioning system in construction of Towers: (3), (4), (5), & (6). #OVM_Featured_Projects
{Update} Completion of Post tensioned concrete slabs works of “Katara Towers” Project in Doha city, Qatar. Execution of OVM Agent in Qatar: MACE-Qatar, which has implemented around 70% of PT works in the project using OVM Post-Tensioning System. #OVM_Featured_Projects
{Update} Early this month, Opening of “Wuijagang” Suspension Bridge over Yangtze River in “Hubei” Province in China. With significant role, OVM has supplied Main Cables of the suspension bridge, Anchoring System, Cables Cranes, and related services. #OVM #OVM_Featured_Projects
{Photos} from the construction of Project: Al-Bidda Roundabout Bridge (RA/222), which was completed last year (2018), with the contribution of OVM Agent in Kuwait, Canar Co. which completed all Post-Tensioning works. #OVM_Featured_Projects
OVM Is proud for its contribution in the accomplishment of project “Extension of Southern Expressway” this year in Srilanka, OVM has supplied Post-Tensioning system, Bearings, Expansion Joints, & Equipment. #OVM_Featured_Projects
{Photos} of “Dekhila Bridge” in Alexandria state in Egypt, Bridge which connects Dekhila Seaport with Coastal Road was completed in 2018 with participation of OVM Agent completing Post-Tensioning works: BETA Company. #OVM_Featured_Projects
{Photos} during the Post-tensioning works for concrete slabs of “Mall of Oman” Project in Sultanate of Oman, which was accomplished last month using OVM Post-tensioning system. #OVM_Featured_Projects
{Photos} Supply and Installation of OVM Expansion Joints at “Al-Jahra Road” Project in Kuwait. #OVM #AL_JAHRA_ROAD #OVM_FEATURED_PROJECTS #KUWAIT #EXPANSION_JOINTS
{Update} Completion of Post-tensioning works for “Hair Ghanimiya Interchange” Project in Riyadh city in Saudi Arabia, Project which consist of Two bridges constructed using PT Box Girder Sections. -Execution of PT: Kabbani Post Tensioning (KPT-OVM). #OVM_Featured_Projects
{Update} Completion of Post-tensioning works for (C3) & (C4) Towers of Alamein Towers {LD01} Project, in New Alamein city in Egypt. Execution of PT Works through OVM Certified Applicator in Egypt: Orascom-CPD. #OVM #Post_Tensioning #OVM_Featured_Projects
{Photos} Orouba Bridge, which was opened to traffic last month in Cairo city in Egypt, was completely constructed using OVM Prestressing System. #OVM #Prestressing #OVM_Featured_Projects
{Photo} of “Rod El-Farag” Cable Stayed Bridge which was completely constructed Mid-Year, the bridge which has made major improvements in the traffic movement in Cairo city in Egypt was constructed using OVM Stay Cable System. #OVM #OVM_Featured_Projects #OVM_Stay_Cable_System
Something went wrong.
Something went wrong.
United States Trends
- 1. Ravens 56.7K posts
- 2. Lamar 45.3K posts
- 3. Bengals 50.6K posts
- 4. #heatedrivalry 9,764 posts
- 5. ilya 12.5K posts
- 6. Joe Burrow 20.1K posts
- 7. shane 15K posts
- 8. Zay Flowers 4,055 posts
- 9. #WhoDey 3,572 posts
- 10. Cowboys 91.9K posts
- 11. Derrick Henry 4,400 posts
- 12. Hudson 10.7K posts
- 13. Perine 1,573 posts
- 14. Zac Taylor 2,598 posts
- 15. Harbaugh 3,071 posts
- 16. Sarah Beckstrom 208K posts
- 17. AFC North 2,283 posts
- 18. #hrspoilers N/A
- 19. Mahomes 33.7K posts
- 20. #CINvsBAL 2,681 posts