DataEssenceAI's profile picture.

Data EssenceAI

@DataEssenceAI

Data EssenceAI さんがリポスト

Big Picture View #ES_F: Every Sat for 1.5 months, I posted a huge Megaphone pattern. I was targeting 6586 resistance. It finally hit, then brokeout Plan Next Week: 6586, 6563=supports. Must hold on dips to keep 6655, 6700, 6720 (new magnet) live If 6563 fails,sell to 6508, 6460

AdamMancini4's tweet image. Big Picture View #ES_F: Every Sat for 1.5 months, I posted a huge Megaphone pattern. I was targeting 6586 resistance. It finally hit, then brokeout

Plan Next Week: 6586, 6563=supports. Must hold on dips to keep 6655, 6700, 6720 (new magnet) live

If 6563 fails,sell to 6508, 6460

Data EssenceAI さんがリポスト

NVIDIA Majestic broadening formation progress report. 5th reference point has been achieved to perfection. Expect erratic behaviour before it lets go. This could take sum weeks, Hope this helps.

great_martis's tweet image. NVIDIA

Majestic broadening formation progress report.

5th reference point has been achieved to perfection.

Expect erratic behaviour before it lets go.

This could take sum weeks,

Hope this helps.

NVIDIA TOPS IN!!! pay attention. Now the erratic churn begins before letting go.

great_martis's tweet image. NVIDIA

TOPS IN!!!

pay attention.

Now the erratic churn begins before letting go.


Data EssenceAI さんがリポスト

NASDAQ Long range update Don't be alarmed; it gets much worse. Limited upside Target 10k (mid 2026)

great_martis's tweet image. NASDAQ 

Long range update

Don't be alarmed; it gets much worse.

Limited upside 

Target 10k  (mid 2026)

Data EssenceAI さんがリポスト

I'm going to keep it simple $SPY $479 $QQQ 412 Hold these levels.. we can see another leg up. whether that be a truncated 5th or a new high is to be determined. failure to hold these levels and I no longer see a valid case for continuation

ATMSnipes's tweet image. I'm going to keep it simple

$SPY $479

$QQQ 412

Hold these levels.. we can see another leg up.

whether that be a truncated 5th or a new high is to be determined.

failure to hold these levels and I no longer see a valid case for continuation
ATMSnipes's tweet image. I'm going to keep it simple

$SPY $479

$QQQ 412

Hold these levels.. we can see another leg up.

whether that be a truncated 5th or a new high is to be determined.

failure to hold these levels and I no longer see a valid case for continuation

Data EssenceAI さんがリポスト

Cybertruck has 120V & 240V outlets on-board, plus a bi-directional charge port Power your house, another EV, power tools or even a party off the grid


Data EssenceAI さんがリポスト

In my 2014 book #CleanDisruption, I predicted that Li-ion #batteries would reach $50/kWh by 2027. That sounded insane — to the linear mainstream — but it looks like #China may reach that number sooner. 🇨🇳 #RethinkingEnergy 🔋 #RethinkingTransportation 🚘

tonyseba's tweet image. In my 2014 book #CleanDisruption, I predicted that Li-ion #batteries would reach $50/kWh by 2027.

That sounded insane — to the linear mainstream — but it looks like #China may reach that number sooner. 🇨🇳

#RethinkingEnergy 🔋 
#RethinkingTransportation 🚘

.@tonyseba love this I am sure. 😄



Data EssenceAI さんがリポスト

High level goals for humanity: 1. Pass / derisk the great filters 2. Reach type 1 on Kardashev scale 3. Launch von Neumann probes to explore the galaxy


United States トレンド

Loading...

Something went wrong.


Something went wrong.